更鋼筋焊接網(wǎng)適合工廠化、規(guī)?;a(chǎn),是效益高、符合環(huán)境保護(hù)要求、適應(yīng)建筑業(yè)工業(yè)化發(fā)展趨勢(shì)的新興產(chǎn)業(yè)。
Steel welded fabric is suitable for industrial and large-scale production. It is a new industry with high efficiency, environmental protection requirements and industrial development trend of construction industry.
鋼筋網(wǎng)的核算原則都有什么
What are the accounting principles of steel mesh
假如梁某邊在墻內(nèi),不包含與墻平齊,則此邊不核算、非的外墻(墻未封頂?shù)臓顩r),其上的梁與板相交,則安置三道,假如梁未與板相交,則安置四道。
If a certain side of the beam is in the wall and does not include flush with the wall, then the external wall (the condition of the wall not capped) on this side is not accounted for and is not the top layer. If the beam on it intersects with the slab, three beams will be placed. If the beam does not intersect with the slab, four beams will be placed.
不管是怎樣運(yùn)用帶肋鋼筋網(wǎng)都需求把握它的核算方法,只要把握了核算方法才能夠正確的運(yùn)用鋼筋網(wǎng)片。
No matter how to use the reinforced mesh with ribs, we need to grasp its accounting method, as long as we grasp the accounting method, we can use the reinforced mesh correctly.
外部墻柱鋼筋網(wǎng)片核算準(zhǔn)則:假如柱的截面小于墻厚,則墻內(nèi)的那面柱不核算鋼筋網(wǎng)片。
External wall column reinforced mesh accounting criteria: if the section of the column is less than the wall thickness, then the column in the wall will not be accounted for reinforced mesh.
外墻柱鋼筋網(wǎng)片原始長度考慮扣減梁高、板厚(包含分層梁、板),即算到梁低或板低;扣梁、板高按墻與梁、板實(shí)踐相交的高度墻梁。
The original length of the reinforcement mesh of the outer wall column is considered to deduct the beam height and slab thickness (including the layered beam and slab), that is to say, the beam height or slab height is calculated as the height of the wall beam intersecting the beam and slab in practice.
鋼筋網(wǎng)片核算準(zhǔn)則:墻梁鋼筋網(wǎng)片原始長度,在原始量中考慮與柱、結(jié)構(gòu)柱的扣減2、梁與板相交,則指梁頂標(biāo)高與板頂標(biāo)高平齊可梁底標(biāo)高與板底標(biāo)高平齊。
Calculation criteria of steel mesh: the original length of steel mesh of wall beam is considered to be deducted from the column and structural column in the original quantity. 2. If the beam intersects the slab, the elevation of the beam top is flush with that of the slab top, and the elevation of the beam bottom is flush with that of the slab bottom.